More about the news
05/12/2023
Big important project has finished in a productional site of ReinnolC
A heat exchanger was delivered to a workshop of a large chemical holding that produces mineral fertilizers. It will help increase the production output and replace the old unit as part of the modernization program.
ReinnolC engineers were able to increase the unit capacity by 30% and at the same time reduce its size by almost a third of the estimated size. This significantly reduсed the consumption of metal.
Follow us
Subscribe to the newsletter